About Us

Everything you need to know about our Company

PERFORMANCE UNDER PRESSURE



Baltimore Hydraulics, Inc. provides repair services to multiple market areas including: Industrial, Construction, Marine, Government and Commercial. The following are examples of some of the more recent and completed Baltimore Hydraulic projects.

Longview Lake Dam Project

Government

Remove, rebuild and reinstall Emergency Draw Down & Sewer Gate cylinders.

  • Project Dates: Feb. 24, 2020 – July 9, 2021
  • Location:   Kansas City, MO

Chesapeake Ship Building

Marine

Cut bow, fabricate & install hardware to allow open access to forward compartment. Design, supply & install hydraulic system to open hull & extend boarding gangway.

  • Project Dates: Jul. 26, 2018 - Aug. 19, 2018
  • Location:   Salisbury, MD

Army Corp of Engineers

Construction

Replace Service Gate No. 4 Water Packing Seat and Rod Bushings. (Outlet Works, Intake Structure)

  • Project Dates: Feb. 24, 2020 - Current
  • Location:   Cherry Creek Dam / Denver, CO

Wheelabrator Baltimore 1

Industrial

Number 3 Boiler. Drain, clean and change replace hydraulic fluid with a glycol based, fire resistant fluid.

  • Project Dates: Jan. 31, 2020 – Feb. 7, 2020
  • Location:   Baltimore, MD

Wheelabrator Baltimore 2

Industrial

Modifications to Turbine EHC unit. Update HPU to include automatic switching to redundant supply pump for turbine bearing lubrication.

  • Project Dates: Jan. 31, 2020 – Feb. 7, 2020
  • Location:   Power Plant / Baltimore, MD
US Coast Guard

U.S. Coast Guard

Government

Overhaul and testing of multiple hydraulic winches for the U S Coast Guard.

  • Project Dates: 2019 - 2024
  • Location:   Five year contract

Smithsonian Institution

Marine

Service; for 41’ UTB BOAT located at SERC - Remove old 3-way control valves and install new electrically operated valves with electrical controls. Install new return line and check valve for winch.

  • Project Dates: Dec. 17, 2019 - Jan. 4, 2020
  • Location:   Edgewater, MD
Lehigh

Lehigh Portland Cement

Industrial

Replace and run new hydraulic tubing to transmitters.

  • Project Dates: Dec. 26, 2019 - Feb. 12, 2020
  • Location:   Union Bridge, MD

Martin Marietta

Industrial

Supply and install four each Graco grease systems for machinery lubrication.

  • Project Dates: Aug. 29, 2019 - Oct. 20, 2019
  • Location:   Baltimore, MD

Bitumar USA, Inc.

Commercial

Inspect & troubleshoot 30 ft. Straight Boom Crane and effect repairs as needed including removal, rebuilding and re-installation of main boom cylinder.

  • Project Dates: May 28, 2019 - Aug. 22, 2019
  • Location:   Baltimore, MD

University of Maryland

Commercial

Removal, repair and replacement of Space Observatory Dome Doors.

  • Project Dates: Feb. 6, 2019 - Apr. 18, 2019
  • Location:   Baltimore, MD

City of Baltimore

Government

Repairs to hydraulic freight elevator including electrical system upgrades and main lifting cylinder replacements.

  • Project Dates: Jan. 23, 2019 - Apr. 30, 2019
  • Location:   Baltimore, MD

Maryland Department of Transportation

Commercial

Five-year contract for Preventive Maintenance Inspections on multiple pieces of equipment at multiple locations.

  • Project Dates: 2018 - 2023
  • Location:   Baltimore, MD

Plasser American Corporation

Commercial

Install customer supplied pumps. Provide labor and material to fabricate and replace all hydraulic hoses on MTA’s PMC110.

  • Project Dates: Dec. 26, 2018 - Mar. 13, 2019
  • Location:   Baltimore, MD

IBWC

Commercial

Upgrade hydraulic system. Installation and pressure testing of new stainless-steel hydraulic piping. Piping is located in a 200-foot pit requiring rope access.

  • Project Dates: Nov. 12, 2018 - Dec. 20, 2018
  • Location:   Del Rio, TX

Chesapeake Bay Foundation

Marine

Modifications to multiple hydraulic systems on board oyster seeding vessel Patricia Campbell. Modified dump hopper to afford a more controlled operation, along with conveyor belt and spinner upgrades.

  • Project Dates: Aug. 20, 2018 - Oct. 21, 2019
  • Location:   Shadyside, MD

Tote Services

Marine

Repairs to the electro/mechanical aspects of the vessel’s four Hagglund Cranes as identified in the TTS Inc. Service report of late 2016. The report has three (3) categories of repairs: 1.1 A. Minor, 1.2 B. Moderate, 1.3 C. Major.

  • Project Dates: Oct. 9, 2017 - Apr. 24, 2018
  • Location:   Baltimore, MD

Army Corp of Engineers

Marine

Sale and installation. Crane replacement contract for Debris Vessel Reynolds located in Baltimore Harbor / Solicitation W912DR-17-T-0078

  • Project Date: Jun. 1, 2017 - Mar. 13, 2018
  • Location:   Baltimore, MD

U.S. Coast Guard

Marine

Emergency Steering Gear flush & fluid change to remove water contamination.

  • Project Dates: Feb. 8, 2017 - Feb. 24, 2017
  • Location:   North Charleston, SC

Army Corp of Engineers

Commercial

For the removal, overhaul, modification & relocation of five hydraulic power units. One for each of the four lock operations & one spare. Each HPU was removed to BHI’s facility for overhaul and testing. Cowling was designed and fabricated to protect each HPU from weather prior to installation.

  • Project Dates: Nov. 2, 2015 - Oct. 7, 2016
  • Location:   Chicago, IL

Army Corp of Engineers

Government

Remove, reseal, & reinstall Emergency and Service Gate cylinders.

  • Project Dates: Sep. 8, 2014 - Nov 21, 2014
  • Location:   Springfield, OH

Army Corp of Engineers

Government

Design, build, install and test new hydraulic power unit for gate operations. HPU design included one reservoir with two separate pumps and controls to provide redundancy.

  • Project Dates: Sep. 8, 2014 - Nov. 21, 2014
  • Location:   Springfield, VT