PERFORMANCE UNDER PRESSURE
Baltimore Hydraulics, Inc. provides repair services to multiple market areas including: Industrial, Construction, Marine, Government and Commercial. The following are examples of some of the more recent
and completed Baltimore Hydraulic projects.
Chesapeake Ship Building
Marine
Cut bow, fabricate & install hardware to allow open access to forward compartment.
Design, supply & install hydraulic system to open hull & extend boarding gangway.
- Project Dates: Jul. 26, 2018 - Aug. 19, 2018
- Location: Salisbury, MD
- Contract Price: $86,292
Army Corp of Engineers
Construction
Replace Service Gate No. 4 Water Packing Seat and Rod Bushings. (Outlet Works, Intake Structure)
- Project Dates: Feb. 24, 2020 - Current
- Location: Cherry Ceek Dam / Dencer, CO
- Contract Price: $119,801
Wheelabrator Baltimore 1
Industrial
Number 3 Boiler. Drain, clean and change replace hydraulic fluid with a glycol based, fire resistant fluid.
- Project Dates: Jan. 31, 2020 – Feb. 7, 2020
- Location: Baltimore, MD
- Contract Price: $42,195
Wheelabrator Baltimore 2
Industrial
Modifications to Turbine EHC unit. Update HPU to include automatic switching to redundant supply pump for turbine bearing lubrication.
- Project Dates: Jan. 31, 2020 – Feb. 7, 2020
- Location: Power Plant / Baltimore, MD
- Contract Price: $26,225
U.S. Coast Guard
Government
Overhaul and testing of multiple hydraulic winches for the U S Coast Guard.
- Project Dates: 2019 - 2024
- Location: Five year contract
- Contract Price: $9,000 – $33,000 (Per winch, depending on model)
Smithsonian Institution
Marine
Service; for 41’ UTB BOAT located at SERC - Remove old 3-way control valves
and install new electrically operated valves with electrical controls. Install new return line and check valve for winch.
- Project Dates: Dec. 17, 2019 - Jan. 4, 2020
- Location: Edgewater, MD
- Contract Price: $6,387
Lehigh Portland Cement
Industrial
Replace and run new hydraulic tubing to transmitters.
- Project Dates: Dec. 26, 2019 - Feb. 12, 2020
- Location: Union Bridge, MD
- Contract Price: $29,373
Martin Marietta
Industrial
Supply and install four each Graco grease systems for machinery lubrication.
- Project Dates: Aug. 29, 2019 - Oct. 20, 2019
- Location: Baltimore, MD
- Contract Price: $13,630
Bitumar USA, Inc.
Commercial
Inspect & troubleshoot 30 ft. Straight Boom Crane and effect repairs as needed including removal, rebuilding and re-installation of main boom cylinder.
- Project Dates: May 28, 2019 - Aug. 22, 2019
- Location: Baltimore, MD
- Contract Price: $21,308
University of Maryland
Commercial
Removal, repair and replacement of Space Observatory Dome Doors.
- Project Dates: Feb. 6, 2019 - Apr. 18, 2019
- Location: Baltimore, MD
- Contract Price: $22,075
City of Baltimore
Government
Repairs to hydraulic freight elevator including electrical system upgrades
and main lifting cylinder replacements.
- Project Dates: Jan. 23, 2019 - Apr. 30, 2019
- Location: Baltimore, MD
- Contract Price: $38,023
Maryland Department of Transportation
Commercial
Five-year contract for Preventive Maintenance Inspections on multiple
pieces of equipment at multiple locations.
- Project Dates: 2018 - 2023
- Location: Baltimore, MD
- Contract Price: $194,890
-
Plasser American Corporation
Commercial
Install customer supplied pumps. Provide labor and material to
fabricate and replace all hydraulic hoses on MTA’s PMC110.
- Project Dates: Dec. 26, 2018 - Mar. 13, 2019
- Location: Baltimore, MD
- Contract Price: $71,750
IBWC
Commercial
Upgrade hydraulic system. Installation and pressure testing of new stainless-steel
hydraulic piping. Piping is located in a 200-foot pit requiring rope access.
- Project Dates: Nov. 12, 2018 - Dec. 20, 2018
- Location: Del Rio, TX
- Contract Price: $296,335
Chesapeake Bay Foundation
Marine
Modifications to multiple hydraulic systems on board oyster seeding vessel
Patricia Campbell. Modified dump hopper to afford a more controlled operation, along with conveyor belt and spinner upgrades.
- Project Dates: Aug. 20, 2018 - Oct. 21, 2019
- Location: Shadyside, MD
- Contract Price: $65,747
Tote Services
Marine
Repairs to the electro/mechanical aspects of the vessel’s four Hagglund Cranes as
identified in the TTS Inc. Service report of late 2016. The report has three (3) categories of
repairs: 1.1 A. Minor, 1.2 B. Moderate, 1.3 C. Major.
- Project Dates: Oct. 9, 2017 - Apr. 24, 2018
- Location: Baltimore, MD
- Contract Price: $47,361
Army Corp of Engineers
Marine
Sale and installation. Crane replacement contract for Debris Vessel Reynolds
located in Baltimore Harbor / Solicitation W912DR-17-T-0078
- Project Date: Jun. 1, 2017 - Mar. 13, 2018
- Location: Baltimore, MD
- Contract Price: $166,310
U.S. Coast Guard
Marine
Emergency Steering Gear flush & fluid change to remove water contamination.
- Project Dates: Feb. 8, 2017 - Feb. 24, 2017
- Location: North Charleston, SC
- Contract Price: $78,508
Army Corp of Engineers
Commercial
For the removal, overhaul, modification & relocation of five hydraulic power units.
One for each of the four lock operations & one spare. Each HPU was removed to BHI’s
facility for overhaul and testing. Cowling was designed and fabricated to protect
each HPU from weather prior to installation.
- Project Dates: Nov. 2, 2015 - Oct. 7, 2016
- Location: Chicago, IL
- Contract Price: $383,585
Army Corp of Engineers
Government
Remove, reseal, & reinstall Emergency and Service Gate cylinders.
- Project Dates: Sep. 8, 2014 - Nov 21, 2014
- Location: Springfield, OH
- Contract Price: $74,521
Army Corp of Engineers
Government
Design, build, install and test new hydraulic power unit for gate operations.
HPU design included one reservoir with two separate pumps and controls
to provide redundancy.
- Project Dates: Sep. 8, 2014 - Nov. 21, 2014
- Location: Springfield, VT
- Contract Price: $70.891